Selectarea paginii țării/regiunii poate influența diferiți factori, cum ar fi prețul, opțiunile de expediere și disponibilitatea produselor.
Media |
|
Aveti întrebari? Aveti nevoie de material? Informatii de presa curente si materiale foto gata de publicare sunt disponibile pentru descarcare aici. Ne face de asemenea placere sa ne contactati telefonic, prin e-mail sau fax! |
|
Press contactDoriti sa fiti adaugati la lista noastra de distributie media? |
Video: Heavy bridge raised easily with secure energy supply from igus12.11.2018
For ships to pass under the Memorial Bridge, it must be raised by a vertical lifting mechanism. In operation an average speed of 1 m/s is required for a total distance of 40 metres. To reduce maintenance and increase overall reliability, the bridge builders used pre-assembled igus readychains instead of the hanging cables of the original design. The cables, which were harnessed with connectors and fitted in energy chains, were pre-assembled in the nearby igus factory and delivered as ready-to-install systems to be fitted on site. |